Change Log

Change Log#

Note

This page is supplementary material for the NIST SP 1800-35 publication.

In December 2024, the following changes were made for the practice guide’s initial public draft:

  • Added builds E2B6, E4B5

In July 2024, the following changes were made for the practice guide’s fourth preliminary draft:

  • Introduced a new manner of content delivery in two formats, one we refer to as the “High-Level Document in PDF Format” and the other as the “Full Document in Web Format.”

  • Added builds E2B4, E3B4, E4B4, E1B5, E2B5, E3B5, and E1B6