Home
How To Navigate
References
Software Disclaimer
Project Page
Models
Use of Concept: cost target
Description
The maximum amount the business can spend on the product’s lifecycle while considering profitOwning Diagram: A14: Converge on design
ICOM Details:
-
Tunneled Concept in Diagram.
-
Control on Activity
A142 Evaluate design concepts
.
Disclaimer: Certain commercial equipment, instruments, or materials are identified in this documentation to foster understanding. Such identification does not imply recommendation or endorsement by the National Institute of Standards and Technology, nor does it imply that the materials or equipment identified are necessarily the best available for the purpose.